Cycling Infrastructure

Cycling Infrastructure

Evidence:

You are viewing page 4 of 7 for 69 records found

Low Level Cycle Signals with an early release. Track trial report (TRL733)

Observations and perceptions of road users using a specially constructed typical ‘urban’ four-arm junction with main traffic signals and low level cycle signals providing an early release ahead of the main signals.

  • Author(s): D. Ball, J. Hopkin, V. Chesterton, R. Gardner, R. Smith, G. Kandasamy, P. Knight and I. York
  • Published: TRL, 2015
  • Date Added: 27 Aug 2016
  • Format: Adobe Portable Document Format